2025 Agronomic Resource Guide_v2 (No Southern BASF)

Mini Ring Timing for mini ring prevention based on university research begins in the mid-summer when the average soil temperature at a 2” depth taken at 11 am reaches 80ºF for three consecutive days. Applications should be watered in with 0.125 - 0.25”. The Envu program below has a satisfaction guarantee and if your expectations are not met, please contact your Envu Distributor or Envu Area Sales Manager.

Product and Use Rate per 1,000 sq. ft.

Good

Better

Best

Application

Ideal for fairways

Ideal for fairways or greens

Ideal for greens

1 st app. (>80°F soil temp)

Densicor ® 0.196 fl. oz.

Densicor 0.196 fl. oz.

Resilia™ 4 fl. oz. 2

Castlon 0.36 fl. oz. +/- Mirage Stressgard 0.6 fl. oz.

Castlon™ 0.36 fl. oz. +/- Mirage Stressgard 0.6 fl. oz. 1

2 nd app. (28 days later)

Mirage ® Stressgard ® 1 fl. oz.

3 rd app. (28 days later)

Densicor 0.196 fl. oz.

Densicor 0.196 fl. oz.

Resilia 4 fl. oz.

Castlon 0.36 fl. oz. +/- Mirage Stressgard 0.6 fl. oz.

Castlon 0.36 fl. oz. +/- Mirage Stressgard 0.6 fl. oz.

4 th app. (28 days later)

5 th app. (28 days later)

Resilia 4 fl. oz.

1 On warm-season greens use the 2(ee) reduced rate of Mirage ® Stressgard ® (0.6 fl. oz.) when paired with Castlon™. If Castlon is not yet registered in your state then use the 1 fl. oz. rate of Mirage Stressgard. 2 Resilia™ has a 2(ee) label recommendation for mini-ring control

Take-all Root Rot Timing for take-all root rot preventation based on university research begins in mid- to late-summer when the average soil temperature at a 2” depth taken at 11 am declines below 85ºF for three consecutive days. Applications should be watered in with 0.125-0.25” and may need to be continued throughout the fall and winter, depending on location, species, rainfall, temperatures, dormancy, etc. The Envu program below has a satisfaction guarantee and if your expectations are not met, please contact your Envu Distributor or Envu Area Sales Manager.

Product and Use Rate per 1,000 sq. ft.

Good

Better

Best

Application

Ideal for fairways

Ideal for fairways or greens Castlon™ 0.36 fl. oz. +/- Mirage Stressgard 0.6 fl. oz. 1

Ideal for greens

1 st app. (<85°F soil temp in mid-to-later summer)

Mirage ® Stressgard ® 1 fl. oz.

Resilia™ 4 fl. oz.

Castlon 0.36 fl. oz. +/- Mirage Stressgard 0.6 fl. oz.

2 nd app. (21-28 days later)

Densicor ® 0.196 fl. oz.

Densicor 0.196 fl. oz.

Castlon 0.36 fl. oz. +/- Mirage Stressgard 0.6 fl. oz.

3 rd app. (21-28 days later)

Tartan ® Stressgard 2 fl. oz.

Resilia 4 fl. oz.

Castlon 0.36 fl. oz. +/- Mirage Stressgard 0.6 fl. oz.

4 th app. (21-28 days later)

Densicor 0.196 fl. oz.

5 th app. (21-28 days later)

Tartan Stressgard 2 fl. oz.

1 On warm-season greens use the 2(ee) reduced rate of Mirage ® Stressgard ® (0.6 fl. oz.) when paired with Castlon™. If Castlon is not yet registered in your state then use the 1 fl. oz. rate of Mirage Stressgard

7

July, 2024

Made with FlippingBook - Online Brochure Maker