2040 Comprehensive Transportation Plan - Adopted 11-19-2024

3 Roadway Element

Figure 22. Cross Section 9.4.3

Figure 23. Cross Section 9.4.5

9.4.3 | 4-Lane, Median-Divided with Sidewalks | 110-ft ROW

9.4.4 | 4-Lane, Median-Divided with Sidewalks | 90-ft ROW

Table 10. 9.4.3 Corridors

Table 11. 9.4.5 Corridors

Corridor Name

From

To

Corridor Name

From

To

Rogers Road (at future Fuquay-Varina Parkway)

N Main Street

N Ennis Street

Wilbur Jones Road (future NC 55 overpass)

Angier Road

Purfoy Road

Figure 24. Cross Section 10.6.1

Bells Lake Road

Johnson Pond Road US 401 (Main Street) US 401 (Main Street) Wake Chapel Road Fanny Brown Road Bells Lake Road Wade Nash Road

Ten Ten Road

Hilltop Road

Panther Lake Road

10.6.1 | 6-Lane, Median-Divided with Side paths | 200-ft/300-ft ROW

Lake Wheeler Road

Ten Ten Road

N Broad Street (NC 55 Highway)

NE Judd Parkway

Old Stage Road

CTP Planning Boundary

Optimist Farm Road

Lake Wheeler Road

Piney Grove-Wilbon Road

CTP Planning Boundary CTP Planning Boundary

Purfoy Road

Fuquay-Varina Parkway (Future)

US 401 (Main Street) Wade Nash Road

Wilbur Jones Rd (future NC 55 overpass) NC 42 Highway/S NC 55 Highway

Piney Grove-Wilbon Road

NC 55 Highway (Broad Street)

Table 12. 10.6.1 Corridors

Corridor Name

From

To

NC 55 Highway (Broad Street) 200-ft ROW NC 55 Highway (Broad Street) 120-ft ROW

CTP Planning Boundary

Wade Nash Road

Wade Nash Road

NE Judd Parkway

US 401 (Main Street/Fayetteville Road) 200-ft ROW

NC 42 Highway/S NC 55 Highway

Lake Wheeler Road

US 401 (N Main Street) 300-ft ROW

Lake Wheeler Road

Ten Ten Road

47

Town of Fuquay-Varina

2040 Comprehensive Transportation Plan

48

Made with FlippingBook - Share PDF online