Alston Experience
• 770,000 SF co-packaging distribution center • 221,646 SF manufacturing and processing build out • Includes warehouse distribution, co-packaging operations, bulk food storage, and professional office space • Ventilation and HVAC systems are designed specifically to serve the requirements of each space; also includes areas of positive pressure and humidity controlled processing spaces • Co-packing equipment was installed in phases as it was being relocated from existing facilities in order to minimize downtime • Started in middle of winter with aggressive schedule and despite record 54” of rain, Alston completed on time Kellogg’s Hearthside at GGLC Byhalia, Mississippi
Made with FlippingBook - Online magazine maker