Clarendon Homes Sample Building Contract

Schedule 3. Excluded Items (Clause 9)

The owner acknowledges that the builder is not responsible for the supply and installation of materials, goods or the provision of services that are listed below: • conditions imposed by any statutory or other authority not included in the Tender ; • items not included in the Tender ; • conditions imposed by the Developer .

Schedule 4. Description of Work

Insert brief description of the building works :

The building works are described in detail in the Tender , plans and specifications.

Page 7 of 31

Made with FlippingBook Publishing Software