Clarendon Homes Sample Building Contract

Other Home Inclusions Tender Period

12 months tender period from date of deposit

Construction Insurance Maintenance Period

Construction insurance premium (home owners warranty)

90 day maintenance period

Pest Control

Pest control certification

Lighting

Light points including compact fluorescent globe

Smoke Detectors Hot Water System Electrical Safety

Smoke detectors provided (direct wired with battery backup)

Electric hot water system

Earth leakage electrical safety switch in single phase meter box

Electrical

2 x TV and 2 x Cat 6 data points

BASIX Assessment

BASIX assessment to State Government requirements

Basic scaffolding, void scaffolding and first floor protection, railing and roof scaffolding as per WH&S requirements, subject to site conditions 10.7 certificate Waste Management Plan Erosion and Sediment Control plan Neighbour Notification plan

Mandatory Site Works

Structural engineering certificate for concrete slab Site contour survey and plan and identification survey Soil test by engineer All weather access control point (standard allowance) Sediment control fencing as required by council Long service levy Trade waste compound as required by council

Essentials

Application Fee

Development Application and Construction Certificate Fees

Water Tank

3000L slimline water tank

Air Conditioning

Relax in climatised comfort and always feel at home with fully ducted reverse cycle air conditioning

Flooring

Carpet and underlay, hybrid flooring, glazed ceramic tiles from standard nominated range to designated areas

Lighting

Bring a feeling of warmth and stylish simplicity into your new home with energy efficient LED downlights (30 pack)

Flyscreens

Flyscreens to opening windows

R6 to ceiling under roof to all living areas, excluding garage and alfresco R2.5 glass wool batts to external walls for living areas and R2.2 internal walls between garage and living areas

Insulation

Security Fencing

Site security fencing as per WH&S requirements

Earthworks

Provide balanced cut and full up to 1.0m to achieve a level building platform

Piering

Piering allowance

Concrete

Concrete pump

Water

Water service connection

Water Fees

Water authority fees (regular connections only)

Sewer

Sewer connection to junction within boundary

Stormwater

Provide 100mm stormwater connection to street/easement

Power

Underground power - 3 phase provision included (where available)

LUXE HOME INCLUSIONS | 4

Made with FlippingBook Publishing Software