Other Home Inclusions Tender Period
12 months tender period from date of deposit
Construction Insurance Maintenance Period
Construction insurance premium (home owners warranty)
90 day maintenance period
Pest Control
Pest control certification
Lighting
Light points including compact fluorescent globe
Smoke Detectors Hot Water System Electrical Safety
Smoke detectors provided (direct wired with battery backup)
Electric hot water system
Earth leakage electrical safety switch in single phase meter box
Electrical
2 x TV and 2 x Cat 6 data points
BASIX Assessment
BASIX assessment to State Government requirements
Basic scaffolding, void scaffolding and first floor protection, railing and roof scaffolding as per WH&S requirements, subject to site conditions 10.7 certificate Waste Management Plan Erosion and Sediment Control plan Neighbour Notification plan
Mandatory Site Works
Structural engineering certificate for concrete slab Site contour survey and plan and identification survey Soil test by engineer All weather access control point (standard allowance) Sediment control fencing as required by council Long service levy Trade waste compound as required by council
Essentials
Application Fee
Development Application and Construction Certificate Fees
Water Tank
3000L slimline water tank
Air Conditioning
Relax in climatised comfort and always feel at home with fully ducted reverse cycle air conditioning
Flooring
Carpet and underlay, hybrid flooring, glazed ceramic tiles from standard nominated range to designated areas
Lighting
Bring a feeling of warmth and stylish simplicity into your new home with energy efficient LED downlights (30 pack)
Flyscreens
Flyscreens to opening windows
R6 to ceiling under roof to all living areas, excluding garage and alfresco R2.5 glass wool batts to external walls for living areas and R2.2 internal walls between garage and living areas
Insulation
Security Fencing
Site security fencing as per WH&S requirements
Earthworks
Provide balanced cut and full up to 1.0m to achieve a level building platform
Piering
Piering allowance
Concrete
Concrete pump
Water
Water service connection
Water Fees
Water authority fees (regular connections only)
Sewer
Sewer connection to junction within boundary
Stormwater
Provide 100mm stormwater connection to street/easement
Power
Underground power - 3 phase provision included (where available)
LUXE HOME INCLUSIONS | 4
Made with FlippingBook Publishing Software