Other Home Inclusions Tender Period
12 months tender period from date of deposit
Construction Insurance Maintenance Period
Construction insurance premium (home owners warranty)
90 day maintenance period
Pest Control
Pest control certification
Lighting
Light points including compact fluorescent globe
Smoke Detectors Hot Water System Electrical Safety
Smoke detectors provided (direct wired with battery backup)
Electric hot water system
Earth leakage electrical safety switch in single phase meter box
Electrical
2 x TV and 2 x Cat 6 Data points
BASIX Assessment
BASIX assessment to State Government requirements
Basic scaffolding, void scaffolding and first floor protection, railing and roof scaffolding as per WH&S requirements, subject to site conditions
10.7 certificate Waste Management Plan Erosion and Sediment Control plan Neighbour Notification plan
Mandatory Site Works
Structural engineering certificate for concrete slab Site contour survey and plan and identification survey Soil test by engineer All weather access control point (standard allowance) Sediment control fencing as required by council Long service levy Trade waste compound as required by council
*1 Clarendon Homes advises that the NSW State Government has implemented changes to BASIX requirements for all Contracts signed from 1st October 2023. This may affect the BASIX requirements and the way your home is assessed to meet those requirements. Any additional changes required to suit the new Government regulations will be at an additional cost by way of variation. *2 Prices are subject to, Bore Hole, Contour, Bushfire, RTA, Hydraulic Engineers or other Statutory reports as required by your 10.7 certificate, 88B or Site Manager. Up to 8m allowed to the relevant connection point with the exception of acreage designs which have 25m allowed.