returns possession of the site to the owner at handover .
3.02 SWIMMING POOLS FROM 1.2 METRE TO 3.0 METRES FROM THE SLAB
The builder requires a minimum distance of 1.2m between the furthest outside edge or bond beam of the swimming pool coping and house/alfresco slab. The builder will not permit any swimming pool (including the required coping) to be within 1.2m of the house /alfresco slab. Where the owner intends to construct a new swimming pool, the builder will require it to be constructed/partly constructed either before taking possession of the site or after handover of the home. Prior to the builder taking possession of the site , where it will be required to undertake construction work from 1.2m to 3.0m of a partly constructed or an existing swimming pool, the owner must ensure that the partly constructed or existing swimming pool is:
• covered by a Performance Cover ; and • enclosed by Security Fencing,
as detailed above in 2.0, to the satisfaction of the builder .
In the event that the builder’s site manager deems the Performance Cover or the Security Fencing is not in accordance with this policy the builder will not be required to, nor will it, take possession of the site . Where the owner requests that a pool or service free area be nominated on the plans to show an existing or proposed pool within 3.0m of the slab, the builder will automatically provide additional piering to the satisfaction of the engineer. The cost of the piering will be charged to the owner as an additional cost.
3.03 SWIMMING POOLS FROM 3.0 METRES TO 5.0 METRES FROM THE SLAB
Where the owner intends to construct a new swimming pool, the builder will require it to be constructed/partly constructed either before taking possession of the site or after handover of the home. Prior to the builder taking possession of the site , where it will be required to undertake construction work within 3.0m to 5.0m of a partly constructed or an existing swimming pool, the owner shall ensure that the partly constructed or existing swimming pool is:
• covered by a Performance Cover ; and • enclosed by Security Fencing,
as detailed above in 2.0, to the satisfaction of the builder.
In the event that the builder’s site manager deems the Performance Cover or the Security Fencing is not in accordance with this policy the builder will not be required to, nor will it, take possession of the site .