Maintenance
DAILY MAINTENANCE CHECK FOR OPTIMUM PERFORMANCE
Disc bolts - Check first 10hrs of operation
BEFORE STARTING WORK • Check all pivot pins are fastened and anchor bolts are correctly tensioned. • Check discs and disc bolt tension to specified torque 250ft/lb / 340Nm. • Check for damaged, worn and fatigued parts. Have machine repaired if necessary. • Ensure all appropriate safety decals are securely attached to machine. • Check hydraulic system is fully primed.3. HY- DRAULIC OPERATION & SAFETY - Priming Hy- draulic System. • Check all safety mechanisms are in place and operating correctly. • Lubricate rear roller bearings 5. MAINTENANCE - Lubrication of Heavy Roller Bearings. • Ensure Instruction manual has been read, understood and stored with machine. NOTE: Always reset adjustments for front disc gang lateral positioning according to instructions 4. FIELD OPERATION - Lateral Front Disc Gang Positioning.
Figure : 4.11 Disc Bolts.
Disc arm locating bolts - Check first 10hrs of operation
Figure : 4.12 Disc Arm Bolts.
5.8
3PL 2100D RIGID SPEEDBUSTER
OPERATOR & SAFETY MANUAL
2100D series Op & Safety Manual.indb 8
20/10/2022 12:19:24 PM
Made with FlippingBook - Online Brochure Maker