Maintenance AFTER DELIVERY CHECK LIST
• Check all pivot pins are fastened and anchor bolts are correctly tensioned. Follow tension speci- fication, see metric & imperial torque tables. 5. MAINTENANCE - Bolt Torque Tables. • Check discs and disc bolt tension to specified torque 250ft lb / 340nm. 2. GENERAL INFORMATION - Bolt Tension. • Ensure all appropriate safety decals are securely attached to machine. 3.SAFETY INFORMATION - Safety Decal Placement. • Check hydraulic system is fully primed. 3. SAFETY INFORMATION - Hydraulic Operation & Safety - Safety Decal Placement. • Check all safety mechanisms are in place and operating correctly. • Lubricate heavy rear roller bearings. 5. MAINTENANCE - Heavy Duty Roller Bearing Fitting In- structions. • Check instruction manual has been stored with machine.
5.2
2142F FOLDING SPEEDBUSTER
OPERATOR & SAFETY MANUAL
2142F op & safety manual.indb 2
20/10/2022 1:05:59 PM
Made with FlippingBook - Online Brochure Maker