PROJECT
QUALITY IMPROVEMENT AND INNOVATION CENTRE, NEWTOWNARDS HOSPITAL
ELECTRICAL CONTRACTOR suite within the main hall which
T he specialist skills of WKK Electrical Services were called on for the complete new electrical installation to the newly renovated and extended McWhinney Memorial Hall at Ards Community Hospital. The facility will now be used to help train the South Eastern Health and Social Care Trust’s 12,000 staff. WKK, in conjunction with the design team, its own specialist sub-contractors and the SEH & SCT AV team, installed a multi-functional video conferencing
facilitates lectures, video conferences and presentations.
Standard AV systems were also installed in minor lecture rooms for smaller presentations and online team meetings. In addition to modifying
the switchboard and integrating a new data system, WKK installed a bespoke lighting system which is controlled by the latest Casambi lighting technology. Fire alarm, CCTV and door access systems were also installed. Commenting on the completed project, Gavin Thompson, Commercial Director for WKK said he was proud to be associated with the showcase project for the Trust.
T: 028 9030 8881 E: info@wkkelectrical.com www.wkkelectrical.com 35 The Cutts, Dunmurry, Belfast BT17 9HN
MECHANICAL CONTRACTOR and plumbing installation, LTHW heating, AC, soils and wastes, sanitary ware and BMS system, also a new boiler plant room and new rooftop AHU plant room. D evlin Mechanical delivered the mechanical services package for the refurb and extension of the
Quality, Improvement and Innovation Centre health facility based at Ards Community Hospital. The scope of works included, ventilation
Devlin Mechanical provided input into the design of the rooftop plant room and worked in tandem with the design team to prepare a buildable solution. Autodesk Revit 3D modelling design software was used to draw out the plant spaces with services installed to ensure everything would fit in the space available. This allowed Devlin to prefabricate components off site. Hugh Scullion, Quantity Surveyor for Devlin Mechanical commented, “This project was a great success. It demonstrates not only the abilities of Devlin Mechanical, but those of our sub-contractors, to install a wide range of intricate mechanical systems. We continue to work across all NI Health Trusts carrying out a variety of complex projects to a high standard.”
T: +44 (0)28 7965 0401 E: info@devlinmechanical.com www.devlinmechanical.com
48 | NI BUILDER
FOLLOW US ON:
www.northernbuilder.co.uk
Made with FlippingBook - professional solution for displaying marketing and sales documents online