FUN Construction Manual 2-9-2026

Fender washer

PPHD Sheathing-to-CFS screw – for fastening wood structural panels and other building materials to cold-formed steel framing.

3. SITE PREPARATION AND CONCRETE FOUNDATION

We recommend engaging professionals to prepare your site for the foundation of your FrameUpNow Home. You’ll generally need two different contractors, one for site prep and another for your concrete slab or wood floor. Do your research and choose them carefully, because mistakes can be costly and have far-reaching and long-term consequences.

Site preparation is always the first phase of any major construction. This process involves clearing the land of trees and debris, leveling the ground for building, and moving materials to and from the site. Using architectural blueprints as a guide, your contractors will stake out the parcel of land and the building site. The staking process helps ensure the home will not encroach on others’ property and aids ideal placement to match your site plan. Excavating , or digging out dirt, is required to create a solid foundation for your home. Typically, the dirt removed during the excavation process may be used later, during the

Page 14|71

Made with FlippingBook Online newsletter maker