Revista AOA_47

cine tauro Walter Weberhofer 1958

Propietario o cliente | Owner or client: Persona natural. Manuel Bustamante de la Fuente Dirección | Address: Calle Washington esquina con Calle Delgado, Cercado de Lima, Lima, Perú Área del terreno | Land area: 1303 m 2 Área construida | GFA (gross floor area): 4916.28 m 2 Filiación cultural | Cultural affiliation: Moderno | Modern Tipología | Typology: Equipamiento privado | Equipamiento privado Estado de protección | Protected status : No cuenta con estado de protección | It is not protected

10

16

08

16

A

A

07

02

09

05

01

08

El cine Tauro es, al igual que otras salas de la época, parte de una edificación mayor que lo contiene, en este caso, el edificio Tauro. Esta edificación quedó inconclusa pues solo se lograron construir la parte del cine y los tres primeros niveles del área de comercio. Este proyecto fue concebido como una edificación con diez pisos de alto además de un sótano y la parte destinada al cine. Bási- camente, el primer nivel está dividido en tres secciones para usos comerciales, cada una con su respectiva área de sótano, además de un hall de distribución que recibe desde el jirón Washington. El segundo y tercer nivel fueron también proyectados para usos de comercio y oficinas, siendo los pisos cuarto al décimo los destinados al uso habitacional y la parte del proyecto que no se llegó a concretar. Estos departamentos presentaban una planta típica en el proyecto original, además de una terraza o roof garden a modo de “décimo primer nivel”. The Tauro movie theater is, like other movie theaters from that time, part of a larger building that contains it, in this case, the Tauro building. This building was left unfinished because only the theater and the first three levels of the commercial area were built. This project was conceived as a ten-story building with a basement and the part intended for the theater. Basically, the first level is divided into three sections for commercial use, each with its respective basement area, in addition to a distribution hall that is accessed from Washington Street. The second and third levels were also designed for commercial and office use, with the fourth to tenth floors designated for residential use and the part of the project that was never completed. These apartments had a typical floor plan in the original project, in addition to a terrace or roof garden as an "eleventh floor".

01

01

16

15

06

11

Planta primer piso_First floor plan

Planta tercer piso_Third floor plan

01

10

20

14

14

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17

Hall_Hall Boletería_Ticket office Foyer_Foyer Platea_Rooftop Mezzanine_Mezzanine Cafetería_Cafeteria Restaurante_Restaurant Tienda_Store Bar_Bar

14

14

14

14

14

15

05

05

Cocina_Kitchen Terraza_Terrace Oficina_Office

07

03

05

08

01

Camerino_Dressing room Departamento_Department Sala de máquinas_Machine room SS.HH._H.H.S Depósito_Warehouse

17

04

Corte AA_Section AA

01

5

10

Fuente: LIBRO: Mejía Ticona, V. (2007). Ilusiones a oscuras. Cines en Lima: carpas, grandes salas y multicines (1897-2007) (p. 201-203). Lima: Autor Source: BOOK: Mejía Ticona, V. (2007). Illusions in the Dark. Movie Theaters in Lima: Marquees, Large Theaters, and Multiplexes. (1897-2007) (p. 201-203). Lima: Author

94 ↤

↦ 95

AOA / n°47

Movimiento Moderno / Modern Movement

Made with FlippingBook - Share PDF online