Navy Spec Welding Audits – Common Areas of Findings

Welding Filler Metal:

Common Audit Finding

Requirement

Correction

Additional testing requirements of fabrication standards not being performed (diffusible hydrogen, chemical composition over check, etc.)

Conduct all additional testing as required by fabrication standards.

S9074-AQ-GIB-010/248 4-7.2.a

Filler metal cleanliness not being properly maintained in storage or at work station

Ensure proper storage and cleanliness of filler metals.

S9074-AR-GIB-010/278 5.3

Filler metal being comingled with other grades or commercial grade filler metal

Ensure proper storage and cleanliness of filler metals.

S9074-AR-GIB-010/278 5.3

Implement procedures to return filler metals to control points after shifts.

Filler metal not being returned to control point at end of shift

S9074-AR-GIB-010/278 5.3

Made with FlippingBook - Share PDF online