Welding Filler Metal:
Common Audit Finding
Requirement
Correction
Additional testing requirements of fabrication standards not being performed (diffusible hydrogen, chemical composition over check, etc.)
Conduct all additional testing as required by fabrication standards.
S9074-AQ-GIB-010/248 4-7.2.a
Filler metal cleanliness not being properly maintained in storage or at work station
Ensure proper storage and cleanliness of filler metals.
S9074-AR-GIB-010/278 5.3
Filler metal being comingled with other grades or commercial grade filler metal
Ensure proper storage and cleanliness of filler metals.
S9074-AR-GIB-010/278 5.3
Implement procedures to return filler metals to control points after shifts.
Filler metal not being returned to control point at end of shift
S9074-AR-GIB-010/278 5.3
Made with FlippingBook - Share PDF online