Beall - Operations Manual - Pneumatic Tank Trailers

47 PRE-LOADING INSTRUCTIONS

Check all valves and controls for damage and make sure that they are in proper working condition before loading.

Make sure that all valves are functioning properly and not damaged.

Make sure all gaskets and seals are in good condition. Check all the plumbing for bolt tightness to avoid spillage.

closed and secure prior to loading and while in transit.

Replace any missing or otherwise impaired dome gasket before loading.

www.

.com

Made with FlippingBook Annual report maker