48 PRE-LOADING INSTRUCTIONS
Before opening the blowdown line, make sure everyone is clear of the exhaust stream. Open blowdown valve before loading. Excess product in the blowdown line can plug the pressure relief valve. Be aware of any product spill out of blowdown line. Some load facilities require this valve to be closed when loading.
NOTICE
NOTICE
PRESSURE RELIEF DEVICE
TOP AIR/ BLOW DOWN HOSE
TOP AIR VALVE
BLOWDOWN VALVE
Make sure that the correct placards are in place, if required, before loading.
NOTICE
If the trailer is loaded by volume make sure the trailer is empty before loading.
Made with FlippingBook Annual report maker