MAAG Americas Achievements in the Last 12 Months Facilities and Office Space Environment Updates
• Paved parking lot and driveway between the two
buildings
• Replaced most forklifts and manlifts
EGR
with new equipment
• Upgraded the 1st floor main office area with new finishes and furniture
• Painted the N and S exterior _walls of the building
• Investing in new LED shop
• Added a women’s bathroom
at the rear of building #2
• Reconfigured lobby area • Installed new door card reader system for the plant and office.
shipping/receiving and __assembly • Investing in new offices in Q3
• Installed new door card reader system for the plant and office. • Installed new security/fire system for ___the plant and office
KENT
• Serviced the retention pond, • Received new VNR lift truck for _inventory. • Installed a new wall with promotional LCD screen for another office space to separate the lobby from the office.
• Finalized the last Dock ___Locking system install
Made with FlippingBook interactive PDF creator