September 2024 Employee Newsletter

MAAG Americas Achievements in the Last 12 Months Facilities and Office Space Environment Updates

• Paved parking lot and driveway between the two

buildings

• Replaced most forklifts and manlifts

EGR

with new equipment

• Upgraded the 1st floor main office area with new finishes and furniture

• Painted the N and S exterior _walls of the building

• Investing in new LED shop

• Added a women’s bathroom

at the rear of building #2

• Reconfigured lobby area • Installed new door card reader system for the plant and office.

shipping/receiving and __assembly • Investing in new offices in Q3

• Installed new door card reader system for the plant and office. • Installed new security/fire system for ___the plant and office

KENT

• Serviced the retention pond, • Received new VNR lift truck for _inventory. • Installed a new wall with promotional LCD screen for another office space to separate the lobby from the office.

• Finalized the last Dock ___Locking system install

Made with FlippingBook interactive PDF creator