SYSTEM/ TECHNOLOGY
SYSTEM’S PRICING
PROJECT IN PIPELINE
TOTAL INVESTMENT
Elquator Wind Turbine Sdn Bhd Vertical wind turbine system
Depending on the units of the system
Ø Rural electrification in South East Asia’s countries
42,337.01 USD per 40kW/unit/location
requires for installation
Ø Plastic to raw oil based on stand-alone hydro system Ø Hydrogen and methanol production based on stand-alone hydro system
Elquator Fuel Sdn Bhd
1,645,095.44 USD per 1 MWh complete system for the project
Depending on the units of the system
requires for installation
Plastic to oil technology
Currency exchange as of 24 th March 2021.
1 USD = MYR 4.13
Made with FlippingBook - professional solution for displaying marketing and sales documents online