Merlyn Arysto July 2026 Brochure

The Level 25 tray Please ensure that the shower head is not positioned directly over the waste as this may restrict flow rate.

The tray must be fitted with the waste positioned along the back wall and not to the front. Contact: technical@merlyn.ie for more information.

133

Made with FlippingBook interactive PDF creator