Curb cuts and driveway widening Residents of Vaughan may apply for a curb cut or driveway widening to improve the functionality of their property. Applications are accepted, processed and work is completed upon request. Driveway widths and curb cuts are regulated by the City’s Zoning By-law 1-88 (PDF) and Zoning By-law 001-2021 . These by-laws ensure the land is used in accordance with building standards. A municipal services inspector processes applications within four to six weeks. Milling and paving This process involves removing and resurfacing worn asphalt to restore road quality and ensure safe, reliable travel for residents and commuters. These improvements play a vital role in extending the lifespan of our roadways, enhancing driving conditions and supporting the City’s commitment to a well- connected and sustainable transportation system.
Guiderail repairs and replacement As part of the road safety device repair program, guiderails are repaired and replaced as required. These repairs ensure road user safety is maintained throughout the city in areas with significant changes in elevation. These damages are identified by our roads patrol team, through annual inspections and reporting through the CRM.
CITY OF VAUGHAN | PUBLIC WORKS
38
Made with FlippingBook Ebook Creator