CASE STUDY
ENVIRONMENT
Saving time and increasing efficiency in Córdoba March 2017 – Feb 2018 | Colombia | Autopistas de la Sabana S.A.A
Source: ANLA
DESCRIPTION The Córdoba-Sucre Road project is a public initiative that forms part of the Colombian Government 3rd generation program (3G) and is made up of eight road sections. In total, it has a built length of 25.31 km of single carriageway, 98.40 km of dual carriageway and 264.11 km of rehabilitation, reaching to a total length of 387.82 km The construction of the second carriageway between Sincelejo and Toluviejo not only saves 25 minutes of travel time but is also an alternative for traffic coming from Antioquia to quickly connect with the coastal area of Sucre, characterised by its tourism and popular gastronomy. PROJECT KEY FEATURES Total road length 18km (80km/h) Dual carriageway (2 x 1,8+3.6+0.3), including a variable central divider (1.5m-7m wide) 1 toll station (La Esperanza) 5 bridges
SERVICES Environmental monitoring of: > 3 air quality sampling locations (CO, NOx, SO2, O3, PM10) > 19 noise survey sampling locations (day/night) > 10 water sampling and testing locations (DO, pH, EC, T, BOD5, COD, SS, TDS, TSS, turbidity, total coliforms, faecal coliforms, NKT, NO2, NO3, NH3, alkalinity, hardness, SO4, chlorides, TP, OP, iron / Hydrobiological testing: benthos, periphyton, macrophytes, plankton, zooplankton, ichthyofauna)
HIGHLIGHTED SERVICES
Field sampling services & monitoring
Roads & Highways services
14
Made with FlippingBook - professional solution for displaying marketing and sales documents online