SGS Roads and Highway Services

CASE STUDY

PROJECT AND CONSTRUCTION MANAGEMENT

Improving the road network in São Paolo March 2012-15 | Brazil | DERSA - Desenvolvimento Rodoviário, S.A.

Source: FUTURE MOTION

DESCRIPTION The Nova Tamoios Planalto highway serves the municipalities of São José dos Campos, Jacareí, Jambeiro and Paraibuna. The objective of this project was to improve the road network to guarantee greater fluidity and capacity. This segment passes through rugged terrain and takes a sinuous route with steep slopes in several segments, hence restricting visibility, impairing safety and making it difficult to implement U-turns and at-grade intersections. The new road dual-section adopted provided essential gains in safety and traffic flow. PROJECT KEY FEATURES  Class 1-A dual carriageway (80km/h) with a total length of 49.5km  Undulating terrain  Two new bridges (154m and 250m, respectively) and a viaduct (220m)  New flexible pavement (172,420m3) and double simple-concrete rigid barrier (49,200m).

SERVICES  Operationalize planning, inspection, and control procedures, with the standardization of formulation, format, placement and recording of information  Analysis and approval of project technical documentation  Coordination of Works and Socio-environmental performance  Preparation of technical-economic, institutional, and financial feasibility studies  Support in Supervision and Inspection services for projects and works, acquisitions, and services  Creation, implementation and operation of a monitoring and evaluation plan for the project program

Source: SIKA

HIGHLIGHTED SERVICES

Project/Construction Supervision

Source: TAMOIOS

Health & Safety Management

Roads & Highways services

15

Made with FlippingBook - professional solution for displaying marketing and sales documents online