SGS Roads and Highway Services

CASE STUDY

QUALITY ASSURANCE

Marine bridge pavement reconstruction in Incheon July - October 2018 | South Korea | Incheon Bridge Co., Ltd.

Source: Sunroad

DESCRIPTION Incheon is South Korea’s third largest city. An expanding coastal metropolis close to the country’s capital, the city is a major industrial port, and a domestic and international transport hub for Korea. The objective of this project was to ensure material quality control and construction inspection services during the pavement re-construction of the large marine Incheon bridge with the goal of improving vehicle driving conditions. PROJECT KEY FEATURES  Steel cable stayed bridge (18.38km)  Cable-stayed bridge span length: 800m  Pavement area: 5,152 m2  Pavement type: PSMA (Polymer Stone-Mastic Asphalt) Overlay  Waterproof layer: Guss asphalt  Compaction method: Roller compacting (Tandem & Macadam Roller)

SERVICES  Temperature control of bituminous mixtures  Pavements & Bridges & Vehicle driving safety through IRI test (evaluating road flatness)  Quality Control of used materials for the project (asphalt, filler, aggregates)  Inspection for the whole re-pavement work process

HIGHLIGHTED SERVICES

Source: Wallich Residence

Industrial safety

CMT laboratory analysis

Statutory & Voluntary inspections

Roads & Highways services

19

Made with FlippingBook - professional solution for displaying marketing and sales documents online