CASE STUDY
HEALTH AND SAFETY
The Three Bridges Tunnel in Catalonia November 2017 – January 2023 | Spain | GENCAT – Infraestructures de la Generalitat de Catalunya, SAU
Source: Sunroad
DESCRIPTION This project aims to improve the C-14 road on the Organyà-Montant de Tost section by widening the existing road and constructing a new tunnel through the Tres Ponts gorge, from its entrance at the Grado de Escalas to near the river Lavansa and linking up with the existing Montán de Tost tunnel, which is set to be widened too. With this new infrastructure, crossing the entire gorge with speed and safety will be possible in a matter of minutes by avoiding passing through a particularly winding route. Furthermore, it represents a new milestone in the history of communications between the villages in the area.
SERVICES Review of health and safety plans based on experience, expertise, and specific examples Initial meetings to establish work methodology, reporting and monitoring Weekly monitoring and coordination on-site of safety, status, and planning Monthly meetings to identify areas of improvement, actions, timing and stakeholders
HIGHLIGHTED SERVICES
Industrial safety
PROJECT KEY FEATURES Total road length 3.32km
Construction Safety
Road widened from 7m to 10m (1,5+3,5+3,5+1,5) New tunnel section with a total length of 1.3km (12.6m wide, 7.9m high) Earthworks: 154,000m3
Roads & Highways services