CASE STUDY
HEALTH AND SAFETY
Crossroads, bridges, and health and safety in East Bohemia July 2018 - October 2021 Year | Czech Republic | Reditelství Silnic a Dálnic CR
Source: Sunroad
3 off-grade crossings 4 noise barriers (total length of 5,46km)
DESCRIPTION The D35 Motorway between Casy and Ostrov will divert traffic from the I/35 road between Holice and Zámrsk. The need for this project is clear from the load on the Hradec Králové – Holice – Vysoké Mýto I/35 road, which is currently near the limit in terms of capacity, traffic and resident safety, and environmental impact. The project allows for economic development in the local regions, which together have more than a million inhabitants. The road will divert long-haul traffic away from urban areas, shorten journey times, increase safety, eliminate congestion, and cut operating costs. When completed, the D35 (28.35km in total) will be an important artery for domestic and international traffic connecting the D1/D47 motorway with the D11, and will connect the north of the Czech Republic with Germany, Poland, and Slovakia. PROJECT KEY FEATURES The entire length of D35 is a part of the TEN-T (Trans-European Transport Network) Total length 14,70km of newly built highway (D26/130)
SERVICES Provision of a team of 15 supervisor experts from health and safety and geo-technicians to road, bridge and electrical specialists Construction site supervision (under FIDIC Conditions) Project management, including cost control and time management Inspection of construction site Project documentation supervision and controlling Quality control Geotechnical Supervision Bridges supervision
HIGHLIGHTED SERVICES
Construction Safety
Statutory & Voluntary inspections
Road surface area: 323,000m2 22 bridges (total length 1,40km) 1 viaduct (451m) over the Loucná valley
Project/Construction Supervision
Roads & Highways services
22
Made with FlippingBook - professional solution for displaying marketing and sales documents online