Civil Engineering /Infrastructure
Construction Sites
Access Routes and Temporary Car Parks
Festival and Outdoor Events
Where are they best installed? Typically used within groundworks, construction and utility projects, they can provide safe access or covering over temporary trenches and excavations -please always refer to a competent temporary works engineer.
Installation timings Each steel road plate can be simply lifted into place via Hiab crane or heavy duty forklift and laid next to one another.
Specialist lifting equipment is required
Single line connection in 10 mins
Grid connection in less than 20 mins
240m2area in approx. 4 hours (depending on ground conditions and site layout)
CONTACT US FOR MORE INFORMATION OR TO REQUEST A QUOTE