Blok 'N' Mesh Product Guide

Marquee/Garden Flooring

Construction Sites

Festivals and Outdoor Events

Flooring Factory

How are they connected? Connect, slot and repeat. Thanks to the tongue and groove design every single mat can be placed and connected quickly, effectively and safely. Simply slot the mat on top of another mat and step down to secure the connection.

Installation timings Safe Site Matting can be installed by one person without any effort, or the need for specialist equipment.

1 person required

Single line connection in 1 min

Grid connection in less than 2 mins

240m2 area in approx. 6.5 hours (depending on ground conditions and site layout) When driving on the mats, do not exceed 5mph

CONTACT US FOR MORE INFORMATION OR TO REQUEST A QUOTE

Eco-friendly and long lasting Made from 100% High Density Polyethylene (HDPE) and recycled

bloknmesh.com

01226 654 040

PVC which is also 100% recyclable.

sales@bloknmesh.com

Made with FlippingBook - PDF hosting