Civil Engineering /Infrastructure
Construction Sites
Festival and Outdoor Events
Access Routes and Temporary Car Parks
How are they connected? The hand hole connectors slip through each hand hole enabling the mats to connect at the top with bolts and washers.
Installation timings Connectors are tightened using standard bolts and oversized washers. A spanner, wrench or battery operated drill is recommended, do not over-tighten. 2 people required. 6 strategically positioned hand holes to aid manual handling Single line connection in 2 mins Grid connection in less than 5 mins 230m2 area in approx. 2 hours (depending on ground conditions and site layout)
When driving on the mats, do not exceed 5mph
CONTACT US FOR MORE INFORMATION OR TO REQUEST A QUOTE
Eco-friendly and long lasting Made from 100% High Density Polyethylene (HDPE) and recycled
bloknmesh.com
01226 654 040
PVC which is also 100% recyclable.
sales@bloknmesh.com
Made with FlippingBook - PDF hosting