19th Avenue PLAT Study

Potential Development Form The node at 19 th Avenue and 24 th Street is developed or will be developed into a modern suburban pattern. With Wolf Branch Creek surrounding it, the remaining undeveloped northeast quadrant has limited potential for connections to the surrounding community, and will likely also develop into a modern suburban pattern. An Access Management Analysis report was completed for the South Shore Corporate Park DRI in 2018. The findings of the report support the expansion of capacity of 19 th Avenue in the vicinity of the South Shore Corporate Park (from 24 th Street to 30 th Street). The report determined that additional improvements at the intersections of 24 th Street and 30 th Street were required to allow the intersections to operate at LOS D with future traffic volumes. Based on this analysis, the following improvements are recommended at each of the intersections at 24 th Street and 30 th Street: • Signalize

• Add Eastbound through lane • Add Westbound through lane • Add Eastbound left turn lane • Add Southbound left turn lane • Add Southbound through/right lane

• Add Northbound through lane (30 th Street SE only) • Add Southbound through lane (30 th Street SE only) Improvements for 19 th Avenue at 24 th Street NE as well as at 30 th Street SE are illustrated in Figure 14 below.

Figure14: 24 th StreetNE&30 th Street SE Improvements

Hillsborough County | 19 th Avenue PLAT Study | June 2020

Page 23

Made with FlippingBook Learn more on our blog