Clean Air America WeldStation Basic User Manual

A TTACHING THE S ECONDARY B OOTH

The Weld Station main unit can have a secondary welding booth attached for added welding stations. This booth can be attached to either side or onto the back of the booth. This achieved by connection through the rectangular opening with bolt patterns on the sides and back of the unit intake plenum. The secondary booth will have a matching openings with bolt patterns in the intake plenum.

NOTE:

Before connecting the main unit and secondary booth, the Flat Gasket must be installed around the connection opening.

Remove the table slides from the adjoining booth walls. The same bolt is used for mounting both table slides to the common booth walls.

For easy access to the bolt holes, remove the internal spark baffles.

Do not install of the metal mesh spark baffles and Reverse Flow TM spark baffles until after the unit and booth have been joined together.

If the spark baffles are already

Copyright © Clean Air America, Inc.

Weld Station User Manual, March 2011

Page 29 of 112

Made with FlippingBook Digital Publishing Software