Clean Air America WeldStation Basic User Manual

installed, remove them. See the 'Removing the Spark Baffles' section of the user manual. Place the main unit in the final location. This may require bolting on some of the cover plates before placement due to obstructions. If risers are being used, they must be installed on the unit before final placement. Place the secondary booth next to the main unit. This may require bolting on some of the cover plates before placement due to obstructions. If risers are being used, they must be installed on the booth before final placement. Slide the secondary booth into place and align the plenum openings and bolt hole patterns. Each rectangular opening has a ten hole bolt pattern. Fasten the secondary booth to the main unit using (10) 1/4" - 20 x 1.0" black socket head cap screw, (20) black 1/4" flat washers, (10) black 1/4" lock washers, and (10) black 1/4"-20 nuts.

Copyright © Clean Air America, Inc.

Weld Station User Manual, March 2011

Page 30 of 112

Made with FlippingBook Digital Publishing Software