DRAINAGE PUMP (OPTIONAL)

If you purchased a Drainage Pump, it will come pre-assembled inside of a pump sump box. When

ordered, we generally send extension legs with the pump sump box. After you have located the extension

legs, bolts and nuts, proceed to install the pump sump box.

Lift the ZeroMist into the air with a forklift truck and lifting chains.

Attach the extension legs to the unit using 3

/ 8 ” bolts .

Next, adjust the float on the pump to your desired

level. The float controls when the pump turns on and

off. Generally the float is set in our factory before

shipping. However this is not always the case. To

ensure the float is properly set, make sure the float

cable is secured by the clamp at the desired level on

the pump with approximately 4 inches of cable

between the clamp and float.

After the float is set, install a line from the drain hole to the pump.

Now install discharge piping provided by the consumer. It is recommended that discharge piping

be at least 1” diameter, and kept as short as possible. Using piping too narrow will restrict flow

and strain the motor, and keeping the discharge piping short reduces pipe friction.

When piping keep in mind this pump has a 37 feet head, meaning no more than 37 vertical feet

can occur from the pump to the discharge area.

To avoid any air returning into the unit through the drainage pipe outlet, it should be equipped

with a drain trap. This should always have at least 150 mm high column of oil.

Lastly, connect a 110 volt power supply for the pump.