Clean Air Industries ZeroMist Oil Mist Collector User Manual

MOUNTING

Now that everything has been installed, you are ready to mount your unit at its desired location.

There are a few things to take into consideration before mounting down the unit.

Ensure filter doors have room to be opened and easily accessed.

Ensure power supply is coming into the unit with no kinks. If a pump was purchased, make sure

you have a nearby 110 volt power supply.

Ensure duct work can be easily installed out of the desired side of the unit.

Ensure a proper drainage has been set up. If a pump was purchased, make sure you have a

clear path back to the machine tool sump.

To mount the unit in concrete, mark the holes onto the ground where you want it to sit. Next, move the

unit out of the way with a forklift and lifting chains. Now that you can easily access your marked holes,

drill out the holes and insert concrete anchors provided by the consumer. Move the unit back onto the

anchors, and bolt it down.

sales@clean-air.com

clean-air.com

1-866-665-1829

Made with FlippingBook - Online Brochure Maker