Highlights: • 13 limestone basins with a capacity of 55 million gallons or 170 acre feet • Stonework is dry-stacked and pinned with dowels where re- quired to anchor steeply stacked units • Translates process of capturing stormwater into an eco- logical sculpture park via a network of iconic detention basins
21
February 2022 csengineermag.com
Made with FlippingBook Annual report