PSS Studies

Objective of PSS

▪ Identify the connection scheme options (and configurations) for the transmission connection of the SHEP taking into account the existing transmission infrastructure within the vicinity of the plant. ▪ To investigate the impact of the new connection to the grid system as well as the impact of the grid system on the operations of the SHEP. ▪ Assess the ability of the SHEP plant to comply with the technical requirements as stated in the Malaysian Grid Code (MGC), Guidelines on Large Scale Solar PV Plant for Connection to Electricity Networks and the Power Purchase Agreement (PPA).

▪ Consider the worst case scenario as priority.