PSS Studies

Test 9 – Reactive power capability of SHEP

Re-cap of SHEP electrical

 QMAX considered at rated MW even though actual PGEN is 30 MW

 Additional back up units (30 no.) not considered

 The infinite bus voltage level is change in steps to simulate the different PCC voltage level

Made with FlippingBook - professional solution for displaying marketing and sales documents online