Test 9 – Reactive power capability of SHEP
SHEP able to meet reactive power capability requirements
No auxiliary MVAR load considered, however, the MVAR capability considered is conservative given there are additional back-up units installed
40
40
30
30
20
20
10
10
0
0
-40
-30
-20
-10
0
10
20
30
-30
-20
-10
0
10
20
30
Qgen- MVAr
Q (At PCC)- MVAr
0.9 pu
1.0 pu
1.10 pu
MGC requirement
0.9 pu
1.0 pu
1.10 pu
MGC requirement