PSS Studies

Test 9 – Reactive power capability of SHEP

 SHEP able to meet reactive power capability requirements

 No auxiliary MVAR load considered, however, the MVAR capability considered is conservative given there are additional back-up units installed

40

40

30

30

20

20

10

10

0

0

-40

-30

-20

-10

0

10

20

30

-30

-20

-10

0

10

20

30

Qgen- MVAr

Q (At PCC)- MVAr

0.9 pu

1.0 pu

1.10 pu

MGC requirement

0.9 pu

1.0 pu

1.10 pu

MGC requirement