Clean Air America WeldStation Central HMI User Manual

I NSTALLING THE I NTAKE S PARK B AFFLES

All of the intake spark baffles must be installed before using the Weld Station. These baffles are the first defense in stopping sparks from passing into the weld station. Smaller width secondary booths will only have one spark baffle of each type. The metal mesh spark baffles must be installed behind the Reverse Flow TM spark baffles. 1. First, carefully slide the top of the metal mesh spark baffle upward into the top channel of the intake at a slight angle (approximately 10 degrees). 2. Then push the bottom of the metal mesh spark baffle inward so that the baffle is vertical and aligned with the bottom channel of the intake. 3. Next slide the metal mesh spark baffle down into the bottom channel of the intake. 4. Slide the metal mesh filter all the way to the right hand side of the intake. Make sure it is seated in the bottom of the channel and shifted so that it is flush with the side of the intake. 5. Repeat steps 1 through 4 for the other metal mesh spark baffle; however slide the second baffle all the way to the left.

Copyright © Clean Air America, Inc.

Weld Station User Manual, March 2011

Page 34 of 137

Made with FlippingBook Annual report maker