R EMOVING THE I NTAKE S PARK B AFFLES
The spark baffles must be removed for installation and cleaning.
1. First carefully slide the Reverse Flow TM spark baffle upward into the top channel.
2. Then pull the bottom of the Reverse Flow TM spark baffle out.
3. Next pull the top of the Reverse Flow TM spark baffle out of the channel. 4. Repeat steps 1 through 3 for the other Reverse Flow TM spark baffle as well as both metal mesh spark baffles.
Copyright © Clean Air America, Inc.
Weld Station User Manual, March 2011
Page 93 of 137
Made with FlippingBook Annual report maker