Installation Job Profile The installation wind professional participates in installing and building new wind turbines in a safe and professional manner. This includes loading and unloading, installing mechanical and electrical systems, and the assembly of a turbine during the execution of a project. They work with a team to perform electrical and mechanical testing, maintenance and repairs, and follow manufacturer and safety guidelines. Installation can occur both on and offshore depending on the project,. usually carries out a variety of tasks in connection with tower section assembly in a safe and professional manner on wind turbines. This role is critical to minimizing risks during the installation of the turbine. This includes preparing components for installation, inspecting, cleaning, and assembling parts according to manufacturer and safety guidelines.

Common job tasks for this job profile include working under supervision to:

Use safe working procedures and appropriate personal protective equipment

Solve basic mechanical tasks e.g. principles of bolted connections

Carry out basic installation tasks e.g. main component preparation, pre-assembly and assembly

Prepare and hand over for commissioning

Inspect welded connections

Assist in the assembly of the tower sections

Install cables inside the tower

Assist in the termination of cables inside the tower

Install turning gear

Prepare control systems for installation

Install component into the tower

Prepare nacelle, tower and blades for installation

Safely use necessary tools and equipment