CH_Aspire_Luxe Comparison

Other Home Inclusions

LUXE

ASPIRE

Tender Period

12 months tender period from date of deposit

Construction Insurance Maintenance Period

Construction insurance premium (home owners warranty)

90 day maintenance period

Pest Control

Pest control certification

Lighting

Light points including compact fluorescent globe

Gas

Gas connection (subject to availability)

Smoke Detectors Hot Water System Electrical Safety

Smoke detectors provided (direct wired with battery backup)

Continuous flow gas hot water system

Earth leakage electrical safety switch in single phase meter box

Electrical

2 x TV and 2 x Cat 6 data points

BASIX Assessment

BASIX assessment to State Government requirements

Basic scaffolding, void scaffolding and first floor protection, railing and roof scaffolding as per WH&S requirements, subject to site conditions 10.7 certificate Waste Management Plan Erosion and Sediment Control plan Neighbour Notification plan

Mandatory Site Works

Structural engineering certificate for concrete slab Site contour survey and plan and identification survey Soil test by engineer All weather access control point (standard allowance) Sediment control fencing as required by council Long service levy Trade waste compound as required by council

5

RANGE INCLUSIONS COMPARISON

Made with FlippingBook Publishing Software