Other Home Inclusions
LUXE
ASPIRE
Tender Period
12 months tender period from date of deposit
Construction Insurance Maintenance Period
Construction insurance premium (home owners warranty)
90 day maintenance period
Pest Control
Pest control certification
Lighting
Light points including compact fluorescent globe
Gas
Gas connection (subject to availability)
Smoke Detectors Hot Water System Electrical Safety
Smoke detectors provided (direct wired with battery backup)
Continuous flow gas hot water system
Earth leakage electrical safety switch in single phase meter box
Electrical
2 x TV and 2 x Cat 6 data points
BASIX Assessment
BASIX assessment to State Government requirements
Basic scaffolding, void scaffolding and first floor protection, railing and roof scaffolding as per WH&S requirements, subject to site conditions 10.7 certificate Waste Management Plan Erosion and Sediment Control plan Neighbour Notification plan
Mandatory Site Works
Structural engineering certificate for concrete slab Site contour survey and plan and identification survey Soil test by engineer All weather access control point (standard allowance) Sediment control fencing as required by council Long service levy Trade waste compound as required by council
5
RANGE INCLUSIONS COMPARISON
Made with FlippingBook Publishing Software