Clean Air Industries WeldStation EVO User Manual

I NSTALLING THE C OVER P LATES

Any intake plenum opening not used for connecting the main unit to the secondary booth must be

covered using one of the plenum cover plates.

It may be necessary to install the cover plates before setting the units in the final location.

Obstructions such as walls or other WeldStations may prevent or hinder access.

Flat Gasket must be installed on the main unit and booths before the cover plates can be

installed.

Align the cover plate blocking the intake plenum opening so that the bolt holes are aligned.

Fasten the cover plate to the main unit or booth using (10) 1/4" - 20 x 1.0" black socket head

cap screw, (20) black 1/4" flat washers, (10) black 1/4" lock washers, and (10) black 1/4"-20

nuts. The screw heads should be on the outside of the unit.

For most installations, it will be necessary to remove the internal baffle plates to install the

cover plates.

Page 28 of 83

1-866-665-1829

clean-air.com

sales@clean-air.com

Made with FlippingBook - professional solution for displaying marketing and sales documents online