A TTACHING THE S ECONDARY B OOTH
The WeldStation main unit can have a
secondary welding booth attached for added
welding stations. This booth can be attached
to either side or onto the back of the booth.
This achieved by connection through the
rectangular opening with bolt patterns on the
sides and back of the unit intake plenum.
The secondary booth will have matching
openings with bolt patterns in the intake
plenum.
NOTE:
Before connecting the
main unit and
secondary booth, the
Flat Gasket must be
installed around the
connection opening.
Remove the table slides from the
adjoining booth walls. The same bolt
is used for mounting both table
slides to the common booth walls.
For easy access to the bolt holes,
remove the internal spark baffles.
Do not install of the metal mesh spark baffles and Reverse Flow TM
spark baffles until after the unit and
booth have been joined together.
Page 29 of 83
1-866-665-1829
clean-air.com
sales@clean-air.com
Made with FlippingBook - professional solution for displaying marketing and sales documents online