Clean Air Industries WeldStation EVO User Manual

A TTACHING THE S ECONDARY B OOTH

The WeldStation main unit can have a

secondary welding booth attached for added

welding stations. This booth can be attached

to either side or onto the back of the booth.

This achieved by connection through the

rectangular opening with bolt patterns on the

sides and back of the unit intake plenum.

The secondary booth will have matching

openings with bolt patterns in the intake

plenum.

NOTE:

Before connecting the

main unit and

secondary booth, the

Flat Gasket must be

installed around the

connection opening.

Remove the table slides from the

adjoining booth walls. The same bolt

is used for mounting both table

slides to the common booth walls.

For easy access to the bolt holes,

remove the internal spark baffles.

Do not install of the metal mesh spark baffles and Reverse Flow TM

spark baffles until after the unit and

booth have been joined together.

Page 29 of 83

1-866-665-1829

clean-air.com

sales@clean-air.com

Made with FlippingBook - professional solution for displaying marketing and sales documents online