I NSTALLING THE T ABLE S LIDES AND T ABLES
Once the unit and secondary booth are attached together,
the table slides and welding tables can be installed into
both the secondary booth and the main unit.
Place the table slide on the wall of the unit so that
the slide channels are horizontal and the channels
open to the inside of the booth.
Align the bolt hole pattern on the table slide to the
bolt hole pattern on the side wall of the booth.
Fasten the table slide to the wall of the booth
using (4) 1/4" - 20 x 1.0" black socket head cap
screws, (8) black 1/4" flat washers, (4) black 1/4"
lock washers, and (4) black 1/4"-20 nuts. The
screw heads should be on the outside of the
booth.
When a secondary booth is being attached on the
side of a main unit, (2) table slides are being
attached to a common booth wall. In this situation,
each of the (4) bolts must be used to attach both
table slides. If the table slide is being installed on
the common wall between a main unit and
secondary booth, the bolt head can be on either
side.
Once all the table slides have been attached to the
booth walls, insert the table into the channel at the
desired height.
The table simply slides into the channels of the
table slides on both sides of the booth. Make sure
the table is being inserted into the same height on
both sides of the booth so that the table is not
tilted.
Page 36 of 83
1-866-665-1829
clean-air.com
sales@clean-air.com
Made with FlippingBook - professional solution for displaying marketing and sales documents online