C ONNECTING THE S ECONDARY B OOTH L IGHT ( S )
On the main unit, the light(s) are already
prewired into the WeldStation electrical
panel and ready to go.
After determining the configuration of the
Secondary Booth (back-to-back or side-
by-side), the light for the Secondary Booth
must be connected to the unit.
If you examine the bottom of the intake,
there are (4) oblong cover plates. These
plates allow access to a 'T' shaped wire
track.
Inside the wire track for the main unit is a
(2) conductor pin connector. The main unit
has a female connector with female pins.
Inside the wire track for the secondary
booth is a (2) conductor pin connector.
The secondary booth has a male
connector with male pins.
Both connectors will be located behind
the right side cover plate. For the main
unit, this is located beneath the electrical
panel.
Find the connectors and run them
through the cable track to make a
connection. Multiple cover plates may
need to be removed to properly run the
connector cables.
Once the cables connectors reach each other, simply press the male connector into the
female connector to make the final light connection. The connectors will only connect
together one way.
Any excess slack in the wire can be left loose inside the wire track.
Page 46 of 83
1-866-665-1829
clean-air.com
sales@clean-air.com
Made with FlippingBook - professional solution for displaying marketing and sales documents online