S HIPPING R ECEIVING , AND I NSPECTION
R ECEIVING AND I NSPECTION
Congratulations on the purchase of your new Clean Air Industries WeldStation EVO System!
Upon receipt of the WeldStation, remove
the master packing list from the unit and
reconcile it with the total shipment.
Report any discrepancies to Clean Air Industries as soon as possible.
Clean Air America’s WeldStation units are
shipped via freight and generally arrive on
a flat bed trailer. The main units are
partially crated, on a pallet, and are
shipped lying on their sides. The
secondary booths are partially crated and
shipped upright.
Remove the packaging from the unit; then
remove the unit from the pallet.
Carefully inspect the unit and any other
items shipped with the unit for any
damage that may have been incurred
during shipping. If damage is found,
report it to the shipping company and Clean Air Industries immediately.
Weld tables and spark baffles are
packaged and shipped inside the booth
area of the main unit or secondary booth.
Page 5 of 83
1-866-665-1829
clean-air.com
sales@clean-air.com
Made with FlippingBook - professional solution for displaying marketing and sales documents online