Beall - Operations Manual - Petroleum Tank Trailers

45 PRE-LOADING INSTRUCTIONS

Check all valves and controls for damage and make sure that they are in proper working condition. If you are top loading, make sure that the valves are all closed as well. This includes the emergency valve control system.

Make sure that all the valves are functioning properly and are free from damage.

Make sure that all gaskets are in good condition. Check all the plumbing for bolt tightness. Check the seals and valves of the vapor recovery system. Make sure that all are in the proper working order. To avoid spillage, product discharge valves must be closed prior to loading and while in transit.

Check the lid assemblies for proper function, seals, and closure mechanisms. Make sure that the emergency venting systems are present and are in proper working order.

www.

.com

Made with FlippingBook Annual report maker