Confidentiality Notice: This electronic message contains information from ElQuator Sdn Bhd which may be privileged or confidential. The information is intended to be for the use of the individual(s) or entity named above. If you are not the intended recipient be aware that any disclosure, copying, distribution or use of the contents of this information is prohibited. If you have received this electronic message in error, please notify us by telephone or email (to the numbers or address above) immediately.
RURAL ELECTRIFICATION FOR SARAWAK
PRESENTED BY:
CONTENT
Objective
Company Information
Sustainable Energy System
Roll Out SEP System
2
OBJECTIVE
The objective of this presentation is:
Briefing on the Renewable Energy solution
System:
Stand-Alone Hydro (SAH) System
Compressed Air Buoyancy System
3
COMPANY INFORMATION
4
Industry:
Renewable Energy
Technical Provider:
ELQUATOR SDN. BHD.
Industry:
Renewable Energy - Water, Wind and Air
Headquarters: Regional Offices:
Malaysia
Denmark, Switzerland, United Kingdom, Thailand and
Philippines
Specialization:
Expert in the design and built green and renewable energy systems with job scopes
including renewable energy consultancy, exploration, design, construction, managing and monitoring for private and public sectors and Government-linked companies
Technology: Sustainable Energy Plant (SEP) CEO Malaysia: Mr. Henrik Pryter Mission Statement:
To support any Government or commercial clients anywhere in the world by providing innovative
solutions
5
THE SYSTEMS
6
SYSTEM AND STORAGE
COMPRESSED AIR BUOYANCY
STAND ALONE MICRO-HYDRO
7
STAND-ALONE HYDRO
1.
Top tank water is released through the 35 degrees angle pipe down Water reaches Pelton turbine
2. 3.
Pelton turbine spins the generator
4.
Water from the Pelton turbine falls and goes through 4 sets of Pryter Impeller
5.
Water sucks by the water pump and
6.
Push to the top tank via the 90
degrees pipe 7.
Water reach the top tank
8.
Restart process no. 1
The energy produced will charge the storage system. The storage system will disburse the electricity to the houses.
8
9
POWER DISTRIBUTION
Small land size requirement i.e. about a size of a basket-ball court
The 100kWh system can distribute 1kW electricity per hour to 100 houses simultaneously. The system runs 24 hours a day. AC power is distributed from the storage energy system. The idea of the microgrid is to simplify the power distribution.
10
CONSUMPTION – 1KWH PER HOUSEHOLD
11
WITH THE STRONG WILL FROM ALL AGENCIES, THE ENERGY POVERTY GROUP CAN ENJOY BETTER LIVING.
Thank you
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12Made with FlippingBook - professional solution for displaying marketing and sales documents online