QUINQUELA MARTÍN CRUISE TERMINAL
5
MOORING
DP WORLD BUENOS AIRES / TRP appoints a team to moor and unmoor according to the length and beam of the cruise ship.
Be warned that DP WORLD BUENOS AIRES / TRP will be able to moor two (2) cruise ships simultaneously.
Third cruise ship or more (3+) , arriving to DP WORLD BUENOS AIRES / TRP same day and same time, the Harbor Pilot at cruise ship will wait for instructions from the pier supervisor.
ENVIROMENTAL SERVICES
REQUEST WITH 48 HRS. IN ADVANCE TO SERVICE DAY OF VESSEL.
If during cruise operations an additional service is requested, best efforts will be done to fulfill it.
Cancellation of the service must be done 24 hrs. in advance to the date and time for which it had been requested otherwise way of dead freight will be charged .
Please, by advice that by Argentine Transport Union Labor and DP WORLD BUENOS AI- RES / TRP security and safety policy, service window included in the rate is 2 hours.
INDUSTRIAL WASTE/ORGANIC GARBAGE
• INCLUDES: 2 STEVEDORS + 1 FORKLIFT (2,5 TON) • MIN TO BE INVOICE: 2.000 KG.
You will not be able to unload waste in bags that have leaks. It is requested that the waste bags to be used are closed with plastic film and thus not have liquid leaks .
Made with FlippingBook - Share PDF online