Fuquay Varina Pedestrian Plan - Adopted 8-1-2022

PLANNING ESTIMATE FUQUAY-VARINA PEDESTRIAN PLAN

PLANNING ESTIMATE FUQUAY-VARINA PEDESTRIAN PLAN

NC License #P-1301

NC License #P-1301

FUQUAY AVE / E. ACADEMY ST: HIGH VIS. XWALKS, REPLACE CURB RAMPS, NEW PEDESTRIAN CROSSING SIGNALS PRIORITY PROJECT #1: DOWNTOWN INTERSECTION IMPROVEMENTS

SIDEWALK AND RAILROAD CROSSING IMPROVEMENTS AT W. ACADEMY ST AND N. ENNIS ST. CROSSING OF THE NORTHFOLK SOUTHERN LINE. PRIORITY PROJECT #2: DOWNTOWN (ACADEMY ST, ENNIS ST) RAILROAD CROSSINGS

LOCATION: DESCRIPTION:

LOCATION:

DESCRIPTION:

FUQUAY AVE / E. RALEIGH ST: HIGH VIS. XWALKS, REPLACE CURB RAMPS, ADD STOP SIGNS S. SPRING AVE / DEPOT ST: HIGH VIS. XWALKS, REPLACE CURB RAMPS, ADD STOP SIGNS

S. SPRING AVE / W. VANCE ST: HIGH VIS. XWALKS, REPLACE CURB RAMPS, ADD IN-STREET YIELD TO PED SIGNAGE S. SPRING AVE / W. SPRING ST: HIGH VIS. XWALKS, REPLACE CURB RAMPS, ADD IN-STREET YIELD TO PED SIGNAGE BROAD ST BETWEEN RANSDELL AND STEWART: HIGH VIS. XWALKS AT MIDBLOCK N. MAIN ST / N. ENNIST ST: HIGH VIS. XWALKS, PUSHBUTTON UPGRADE AND LEAD PEDESTRIAN INTERVAL, REPLACE CURB RAMPS MAIN ST / ACADEMY ST: HIGH VIS. XWALKS, PUSHBUTTON UPGRADE AND LEAD PEDESTRIAN INTERVAL, REPLACE CURB RAMPS S. MAIN ST / VANCE ST: HIGH VIS. XWALKS, PUSHBUTTON UPGRADE AND LEAD PEDESTRIAN INTERVAL, REPLACE CURB RAMPS DEPOT ST BETWEEN S. SPRING AVE AND S. MAIN ST: CONVERT TO FESTIVAL STREET BY INSTALING BOLLARDS AT INTERSECTIONS AND DRIVEWAY ENTRANCES.

2

INTERSECTIONS:

COUNTY:

WAKE

DIVISION:

5

ITEM NO.

UNIT PRICE

ITEM DESCRIPTION

QUANTITY UNIT

AMOUNT

DESC. NO.

SECT. NO.

TRAIL ITEMS

12

INTERSECTIONS

MOBILIZATION CONSTRUCTION SURVEYING

SY SY EA LS LS LS LS

0000100000-N 0000400000-N 0043000000-N 2591000000-E 2605000000-N 2612000000-E 4399000000-N

800 801 226 848 848 848

1 1 1

$29,000.00 $3,000.00 $8,000.00

$29,000.00 $3,000.00 $8,000.00 $9,230.00 $18,000.00 $9,000.00 $30,000.00

COUNTY:

WAKE

DIVISION:

5

GRADING

CONCRETE CURB RAMP 6" CONCRETE DRIVEWAY 4" CONCRETE SIDEWALK

142

$65.00

ITEM NO.

UNIT PRICE

6

$3,000.00

ITEM DESCRIPTION

QUANTITY UNIT

AMOUNT

DESC. NO.

SECT. NO.

90

$100.00

TEMPORARY TRAFFIC CONTROL

TRAIL ITEMS MOBILIZATION

1105

1

$30,000.00

RAILROAD CROSSING UPGRADE (SIGNAL ARM ASSEBMLIES, PAVING AT TRACK CROSSING, ETC.)

SF LF EA LS LF EA LS

0000100000-N 2605000000-N 4025000000-E 4072000000-E 4102000000-N 4399000000-N 4710000000-E

800 848

1

$30,000.00 $3,000.00

$30,000.00 $159,000.00 $2,160.00 $3,240.00 $1,800.00 $40,000.00 $33,800.00

LS

2

$200,000.00

$400,000.00

CONTR FURN, ***SIGN (E) CONCRETE CURB RAMP

53

EROSION CONTROL ALLOWANCE

LS LS

1 1

$2,000.00 $24,000.00

$2,000.00

108 162

$20.00 $20.00 $150.00

MINOR ITEMS (5%)

$24,000.00 CONSTRUCTION COST SUBTOTAL $532,230.00 CONTINGENCY (30%) $159,670.00 OPINION OF PROBABLE CONSTRUCTION COST $691,900.00 $138,380.00 OPINION OF TOTAL CONSTRUCTION COST (2022) $830,000.00 NCDOT ADMINISTRATION FEE (20%)

SUPPORTS, 3-LB STEEL U-CHANNEL

903 904

SIGN ERECTION, TYPE E

12

TEMPORARY TRAFFIC CONTROL

1105 1205

1

$40,000.00

THERMOPLASTIC PAVEMENT MARKING LINES (24", 120 MILS)

4,225

$8.00

MAIN ST / ACADEMY ST INTERSECTION SIGNAL IMPROVEMENT: ADD LEAD PEDESTRIAN INTERVAL AND EX. UPGRADE PUSHBUTTONS TO APS S MAIN ST / VANCE ST INTERSECTION SIGNAL IMPROVEMENT: ADD LEAD PEDESTRIAN INTERVAL AND EX. UPGRADE PUSHBUTTONS TO APS N. MAIN ST / N ENNIST ST INTERSECTION SIGNAL IMPROVEMENT: ADD LEAD PEDESTRIAN INTERVAL AND EX. UPGRADE PUSHBUTTONS TO APS FUQUAY AVE / E ACADEMY ST INTERSECTION SIGNAL IMPROVEMENT: PEDESTRIAN TRAFFIC SIGNALS (4 LEGS)

LS

1

$40,000.00

$40,000.00

CONSTRUCTION ENGINEERING AND INSPECTION (15%) (2022)

$125,000.00

LS

1

$12,000.00

$12,000.00

LS

1

$12,000.00

$12,000.00

NOTE:

ESTIMATE IS NOT BASED ON AN ENGINEERING DESIGN, AND IS FOR PLANNING PURPOSES ONLY. BASED ON 2022 UNIT PRICES, INFLATION NOT INCLUDED

LS

1

$12,000.00

$12,000.00

ASSUMES LAP FUNDING REQUIRING NCDOT ADMINISTRATION FEE.

BOLLARD

EA LS

8 1

$1,000.00 $16,000.00

$8,000.00

EXCLUDES RIGHT-OF-WAY, DESIGN, AND PERMITTING. UNDERGROUND UTILITY COORDINATION/RELOCATION COSTS UNKNONWN AND NOT INCLUDED.

MINOR ITEMS (5%)

$16,000.00 CONSTRUCTION COST SUBTOTAL $370,000.00 CONTINGENCY (30%) $111,000.00 UTILITIES (ABOVE GROUND) $55,000.00 OPINION OF PROBABLE CONSTRUCTION COST $536,000.00 $107,200.00 OPINION OF TOTAL CONSTRUCTION COST (2022) $643,000.00 NCDOT ADMINISTRATION FEE (20%)

COMPUTED BY

CJA

DATE

6/24/2022

CONSTRUCTION ENGINEERING AND INSPECTION (15%) (2022)

$96,000.00

ESTIMATE IS NOT BASED ON AN ENGINEERING DESIGN, AND IS FOR PLANNING PURPOSES ONLY. BASED ON 2022 UNIT PRICES, INFLATION NOT INCLUDED.

NOTE:

ASSUMES LAP FUNDING REQUIRING NCDOT ADMINISTRATION FEE.

EXCLUDES RIGHT-OF-WAY, DESIGN, AND PERMITTING. UNDERGROUND UTILITY COORDINATION/RELOCATION COSTS UNKNONWN AND NOT INCLUDED.

COMPUTED BY

CJA

DATE

7/26/2022

N:\Shared\PROJECTS\2021\00-2021-074 Fuquay-Varina, NC Pedestrian Plan\Products\Estimate (Planning)\2021-074_Planning Estimate_#1_Downtown Intersections.xlsx 1

N:\Shared\PROJECTS\2021\00-2021-074 Fuquay-Varina, NC Pedestrian Plan\Products\Estimate (Planning)\2021-074_Planning Estimate_#2 Downtown Railroad Crossings.xlsx 1

142

143

APPENDIX E: PRIORITY PROJECT COST ESTIMATES

FUQUAY-VARINA PEDESTRIAN PLAN