Fuquay Varina Pedestrian Plan - Adopted 8-1-2022

PLANNING ESTIMATE FUQUAY-VARINA PEDESTRIAN PLAN

PLANNING ESTIMATE FUQUAY-VARINA PEDESTRIAN PLAN

NC License #P-1301

NC License #P-1301

PRIORITY PROJECT #5: FUQUAY-VARINA MIDDLE SCHOOL CONNECTIVITY PATH NOTE 2 - KENNETH CREEK

350 LF 10' WIDE ASPHALT SHARED USE PATH FROM FUQUAY-VARINA HOMES-ELDERLY ACCESS ROAD TO SOUTH PARK 910 LF 10' WIDE CONCRETE SIDE PATH ALONG WAGSTAFF RD IN GAPS BETWEEN COTTON BROOK DR AND S MAIN ST 850 LF 10' WIDE CONCRETE SIDE PATH ALONG S. MAIN ST FROM WAGSTAFF RD AND ALONG FUQUAY-VARINA HOMES-ELDERLY ENTRANCE PRIORITY PROJECT #5: FUQUAY-VARINA MIDDLE SCHOOL CONNECTIVITY PATH NOTES 4, 6-9 CROSSING IMPROVEMENTS AT WAGSTAFF RD/SOUTH MAIN ST, AND ACROSS WAGSTAFF RD TO CARROLL HOWARD JOHNSON PARK

LOCATION:

LOCATION:

2000 LF 10' WIDE ASPHALT GREENWAY ALONG KENNETH CREEK FROM S. WILLHAVEN DR TO ANDERSON WOOD DR

DESCRIPTION:

DESCRIPTION:

0.4 MILES

TOTAL LENGTH:

COUNTY:

WAKE

DIVISION:

5

0.4 MILES

TOTAL LENGTH:

ITEM NO.

UNIT PRICE

COUNTY:

WAKE

DIVISION:

5

ITEM DESCRIPTION

QUANTITY UNIT

AMOUNT

DESC. NO.

SECT. NO.

TRAIL ITEMS

MOBILIZATION CONSTRUCTION SURVEYING

LS LS LS

ITEM NO.

0000100000-N 0000400000-N 0043000000-N 1121000000-E 1523000000-E 1575000000-E 2605000000-N 4399000000-N 8801000000-E

800 801 226 520 610 620 848

1 1 1

$68,000.00 $15,000.00 $282,000.00

$68,000.00 $15,000.00 $282,000.00 $44,500.00 $48,000.00 $12,000.00 $6,000.00 $10,000.00 $171,600.00 $60,000.00 $390,000.00 $25,000.00 $30,000.00

UNIT PRICE

ITEM DESCRIPTION

QUANTITY UNIT

AMOUNT

DESC. NO.

SECT. NO.

GRADING

TRAIL ITEMS

AGGREGATE BASE COURSE

TON TON TON

890 240

$50.00 $200.00 $800.00

MOBILIZATION CONSTRUCTION SURVEYING

LS LS LS

0000100000-N 0000400000-N 0043000000-N 1121000000-E 1523000000-E 1575000000-E 2549000000-E 2591000000-E 2605000000-N 4399000000-N

800 801 226 520 610 620 846 848 848

1 1 1

$30,000.00 $16,000.00 $94,000.00

$30,000.00 $16,000.00 $94,000.00 $40,400.00 $12,500.00 $4,000.00 $75,000.00 $107,580.00 $36,000.00 $20,000.00 $80,000.00 $20,000.00

ASPHALT CONC SURFACE COURSE, TYPE S9.5C

MSE RETAINING WALL NO **** TEMPORARY TRAFFIC CONTROL ASPHALT BINDER FOR PLANT MIX CONCRETE CURB RAMP

15

GRADING

LS LS LS LF LF SF LS EA

2 1

$3,000.00 $10,000.00

AGGREGATE BASE COURSE

TON TON TON

1,010

$40.00 $250.00 $800.00 $50.00 $55.00

1105

ASPHALT CONC SURFACE COURSE, TYPE S9.5C

50

SP

1,430 1,200

$120.00 $50.00

ASPHALT BINDER FOR PLANT MIX 2'-6" CONCRETE CURB & GUTTER 4" CONCRETE SIDEWALK

5

WOOD SAFETY RAILING PEDESTRIAN BRIDGE DRAINAGE ALLOWANCE

LS LS LS LS SY EA LF

1,500 1,956

130

$3,000.00 $25,000.00 $30,000.00 $55,000.00

1 1

CONCRETE CURB RAMP

12

$3,000.00 $20,000.00 $80,000.00 $20,000.00

EROSION CONTROL ALLOWANCE

TEMPORARY TRAFFIC CONTROL

1105

1 1 1 1

MINOR ITEMS (5%)

1 $55,000.00 CONSTRUCTION COST SUBTOTAL $1,217,100.00 CONTINGENCY (30%) $365,130.00 OPINION OF PROBABLE CONSTRUCTION COST $1,582,230.00 $316,446.00 OPINION OF TOTAL CONSTRUCTION COST (2022) $1,899,000.00 NCDOT ADMINISTRATION FEE (20%)

DRAINAGE ALLOWANCE

EROSION CONTROL ALLOWANCE

MINOR ITEMS (5%)

$25,000.00 $25,000.00 CONSTRUCTION COST SUBTOTAL $560,480.00 CONTINGENCY (30%) $168,150.00 UTILITIES (ABOVE GROUND) $15,000.00 OPINION OF PROBABLE CONSTRUCTION COST $743,630.00 $148,726.00 OPINION OF TOTAL CONSTRUCTION COST (2022) $892,000.00 NCDOT ADMINISTRATION FEE (20%)

CONSTRUCTION ENGINEERING AND INSPECTION (15%) (2022)

$285,000.00

NOTE:

ESTIMATE IS NOT BASED ON AN ENGINEERING DESIGN, AND IS FOR PLANNING PURPOSES ONLY. BASED ON 2022 UNIT PRICES, INFLATION NOT INCLUDED. ASSUMES LAP FUNDING REQUIRING NCDOT ADMINISTRATION FEE. EXCLUDES RIGHT-OF-WAY, DESIGN, AND PERMITTING. UNDERGROUND UTILITY COORDINATION/RELOCATION COSTS UNKNONWN AND NOT INCLUDED.

CONSTRUCTION ENGINEERING AND INSPECTION (15%) (2022)

$134,000.00

NOTE:

ESTIMATE IS NOT BASED ON AN ENGINEERING DESIGN, AND IS FOR PLANNING PURPOSES ONLY. BASED ON 2022 UNIT PRICES, INFLATION NOT INCLUDED

ASSUMES LAP FUNDING REQUIRING NCDOT ADMINISTRATION FEE.

COMPUTED BY

CJA

EXCLUDES RIGHT-OF-WAY, DESIGN, AND PERMITTING. UNDERGROUND UTILITY COORDINATION/RELOCATION COSTS UNKNONWN AND NOT INCLUDED.

6/24/2022

DATE

COMPUTED BY

CJA

DATE

6/24/2022

N:\Shared\PROJECTS\2021\00-2021-074 Fuquay-Varina, NC Pedestrian Plan\Products\Estimate (Planning)\2021-074_Planning Estimate_#5.2_Middle School.xlsx 1

N:\Shared\PROJECTS\2021\00-2021-074 Fuquay-Varina, NC Pedestrian Plan\Products\Estimate (Planning)\2021-074_Planning Estimate_#5.4-9_Middle School.xlsx 1

146

147

APPENDIX E: PRIORITY PROJECT COST ESTIMATES

FUQUAY-VARINA PEDESTRIAN PLAN